MDEC was selected by client by to supervised & developed the Road networks. including Structural Culverts. Traffic Signage and Road Markings. Electrical systems (street lighting and traffic lights). Edge treatments (curbs, sidewalks, landscaping) and Sewerage System. This is to develop Phase 2 in industrial City located in Assir Region Road 4 – 110 km. Road 5 – 8.85 km. Road 6 – 45 km