Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home3/dotsolut/public_html/mdec.com.sa/wp-includes/functions.php on line 6114
News – MDEC
Al Khobar , Bandariah Area
Al Bandriah Center, KSA
Sun - Thu 8.00AM - 5.00PM
Friday - Saturday CLOSED

News

All information about company - Modern Design & Engineering Consultancy
Coronavirus (COVID-19)
  • Posted by: MDEC
  • Category: General Construction, Uncategorized

The new bus interchange is a vital component of the entire Best Build redevelopment project, which will completely revamp the image of the city

Read more