Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home3/dotsolut/public_html/mdec.com.sa/wp-includes/functions.php on line 6114
Future Pipes Factory – Yanbu – MDEC
Al Khobar , Bandariah Area
Al Bandriah Center, KSA
Sun - Thu 8.00AM - 5.00PM
Friday - Saturday CLOSED

Future Pipes Factory - Yanbu

PROJECT OVERVIEW

This is a complex factory intended for production of GRP & GRE pipes w/ the ff. area and facilities such as.
– Production Bldg / GRP & GRE Fitting Bldg.
– Raw Material Store / Testing & QC area / Catalyst/
– Chemical Rooms/ Open Storage area

Admin bldg/ Mosque/ Canteen/
– Parking spaces for Cars & Trucks
– Space for Future Expansion

SERVICE RENDERED

– Conceptual Design
– Detailed Engineering Drawing
– Tender Documentation