Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home3/dotsolut/public_html/mdec.com.sa/wp-includes/functions.php on line 6114
ETS Laboratory – MDEC
Al Khobar , Bandariah Area
Al Bandriah Center, KSA
Sun - Thu 8.00AM - 5.00PM
Friday - Saturday CLOSED

ETS Laboratory

PROJECT OVERVIEW

A Modern Laboratory Building specialized for classifying different kinds of solid material or specialty rocks.

This project is consist of the following:
2 laboratories
offices

The outside finishes are made of concrete with aluminum composite cladding, structural glass windows & stainless cladding at entrance columns.