Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home3/dotsolut/public_html/mdec.com.sa/wp-includes/functions.php on line 6114
Saudi Railway Organization – MDEC
Al Khobar , Bandariah Area
Al Bandriah Center, KSA
Sun - Thu 8.00AM - 5.00PM
Friday - Saturday CLOSED

Saudi Railway Organization

PROJECT OVERVIEW

The current Railway #1 is a passenger and freight dictated railway operating at a speed 120 km/hr and an axial load of 25 ton/axis. The futuristic operation will be running passenger trains by speed of 250km/hr with the same axial load and cargo trains by speed of 120 km/hr and an axial load of 32.5 ton/axis. Saudi Railway Organization (SRO) thus the consultants to perform the following works as per future operation requirements:

1. Evaluation of the capacity and safety of four existing bridges (146.463 km, 426.617km, 434.887 km, 446.295km) between Riyadh and Al Hofuf.
2. Design of two new parallel bridges (146.463km, 426.617km)
3.Evaluation of sleeper beam B70

SERVICE RENDERED

  • Pre-design (Soil Testing Surveying & Site Analysis)
  • Detailed Engineering Drawings
  • Tender Documents Preparation